Open House scheduled for March 5th

We are very pleased to announce our Open House Event! Saturday March 5th. Much more details to be announced as we finalize everything, but one of the exciting things I CAN tell you is that we will be featuring a showcase with many of the companies I love. You hear me talk about the Panasonic [...]

BCM Construction Day 166: Kitchen and painting

We’re really headed to the homestretch with another weekend of painting.  The kitchen / gameroom is really starting to come together! Vanna White (Rebecca) presents the kitchen / gameroom.  Cabinets are in place, ceiling is painted, lighting and fans are in, dishwasher is ready for installation and the fridge is in place. Other side of [...]

BCM Construction Update Days 143-160

Did not realize just how long we’ve gone without an update.  A lot of the interior finish work has been moving right along and we have a lot of photos to share so let’s get right to it! NOVEMBER 21 Long time Colorist and good friend Ron Anderson pitches in on the painting.   Putting in [...]

BCM_Construction_Day 142: Floors and ceilings start!

Today was a whirlwind of activity at the building.  Flooring crew, ceiling crew and doors!  Man, stay away for a few hours and the whole place changes! Stack of doors ready for installation.  French doors, solid doors, double doors, we pretty much have one of everything…. Ceiling grid installed in the Media Library.  We’ll have [...]

BCM_Construction_Day 140: Painting and parking lot

We went into the building on Saturday to do some of the detail painting and found a completed parking lot!  Finally, we can stop walking through mud and dirt to get into the building.   Landscaping came out fantastic too.  It’s a good base to get us started and we’ll definitely be modifying it as we [...]

BCM_Construction_Day 139: Parking Lot and Landscaping

Major changes outside today.   From morning to afternoon the exterior took on a major change….. 8:30am, prepping the parking lot, smoothing and grading everything properly. Looking further to the left, dump truck taking away some of the extra dirt left over in the parking lot. 8:30am working the hill in back of the building.  Prepping [...]

BCM_Construction_Day 138: Landscaping!

Really REALLY excited to see the attention focused back outside the building.  The past few entries have mainly been us painting, but today the landscapers really took over. Here’s how everything looked first thing this morning.   That ladder on the right is the brick guys cleaning up the brick. Cute little Red Maple trees will [...]

BCM_Construction_Days 133-135

It was another fun filled weekend of painting.  We’re getting closer and closer to getting to move in. The curb out front is finally going away.  Getting ready to install the concrete apron from the street and then soon the parking lot! Adrienne wondering why she painted some blue trim on the top of the [...]

BCM_Construction_Days 127 & 128: Painting

It’s Days 127 and 128 on the construction of the new facility and we can finally see that the end of our journey is in sight.    Still have at least another month before completion, but we can now see the entire place really taking shape.  The drywall, sanding and priming was all completed this [...]

BCM_Construction_Day 118: Wow!

Ok, it’s been over a week since the last update on construction because it’s been a lot of little things.  Some minor framing tweaks, a LOT of electrical run and the insulation.  But today…..  WOW!   Huge changes in just 10 hours. Today was drywall day.  As in 4800 square feet of drywall hung up in [...]